The north side was waterproofed before the fill is brought in.












This is the south side and the meager amount of fill we had on site, the nearby pit closed temporarily and put a halt to the waterproofing process. It should open this week so that the top of the structure can be covered in bentonite, insulation, fill and membrane.








With 12 inch block, they filled in the space around the kitchen window and sliding door at the back of the house.












The separation between the two garage doors and the the two windows at the front of the house were blocked in.