Wednesday, April 30, 2008

Finishing The Waterproofing and Pouring the Floor



The membrane is the final waterproofing layer before the fill and topsoil is put on top of the house.
















A galvalume cap will hold the membrane on at the parapet wall.
















This is the garage, but all the interior spaces were covered with plastic sheeting and felt at the wall so that when the floor is poured it will "float" and not adhere to the footer or walls.











This pavement I found at the Sunoco station down the road, I will use it for a garage pad and walkway to the front and door to garage.

1 comment:

Unknown said...

this blog is very informative for me....its a great work from ur side....thanks and congrats...
Pile Repairs
Waterproofing