Framing and Windows Installed



The framing for the curved, descending wall for the master bath shower. This will be lathed then stucco applied before I tile the inside and out. I designed the shower this way to maximize the light into the bath from the window in the shower.


















One of the 3 panel sliding doors and the master bath window.













The floor pour went well.













The framers are doing a great job framing the domed areas.












Here you can see the vent openings brought out to the side of the building just outside the membrane area.






















The pole installed at the side of the mound on the south side of the house for the solar pv panel.