
The drain field for the septic system.

The tiling in the master shower. I still need to grout the vertical tiling.
Their were multiple cracks throughout the kitchen/living/dining room slab--so I had a crack isolation membrane installed before I tiled.
The solar PV panel. Along with the solar hot water, I should be selling KWs back to the electric company during the day.

2 comments:
Wishing you much love, peace, and happiness
That shower looks so cool!
Post a Comment