Tuesday, September 2, 2008

Septic, Solar PV and Tiling



The drain field for the septic system.















The tiling in the master shower. I still need to grout the vertical tiling.















Their were multiple cracks throughout the kitchen/living/dining room slab--so I had a crack isolation membrane installed before I tiled.













The solar PV panel. Along with the solar hot water, I should be selling KWs back to the electric company during the day.

2 comments:

Bachelor Paul said...

Wishing you much love, peace, and happiness

Jereality said...

That shower looks so cool!